Step 1 -
Digging the Hole
Put gravel/small rocks in hole
Place post in hole and determine placement in regards to post before and post after
Pour already wet cement into hole all around base of post. We used 80lb bags per post, those suckers aren't going to come out very easily.
Insure Post is level. When cement has been all poured in then fill in with dirt. pack down and again, be sure the post is level.
No comments:
Post a Comment